Beth Groner Real Estate
Quiet brick storefronts and a clean sidewalk corner in a small Virginia town under a clear early-winter sky.

Where Kilmarnock's Main Street and Irvington Road Plans Stand This Winter

Going into the holidays, three stretches of road in and around Kilmarnock carry state application numbers. Number 13921 is Route 200 at Harris Road. Number 13925 is Route 3 from Hawthorne to Route 688. Number 13926 is Route 3 from Food Lion to School Street. Lancaster County filed all three in Virginia's current SMART SCALE funding round, and all three appear on the list of applications presented to the Commonwealth Transportation Board in October 2026.

Put those three on a map and they form one loop. North Main Street runs past the Walmart entrance, Food Lion and Rappahannock Community College to School Street. Route 688 connects that stretch to Irvington Road. Route 688 has a different name at each end: on North Main Street it is James B. Jones Memorial Highway, and where it meets Route 200 it is Harris Road. If you drive between Main Street and Irvington Road, these applications cover most of your route. The next public step on them comes in January.

Two Studies, One Winter Meeting

The applications started as two Virginia Department of Transportation studies under its STARS program, which looks for lower-cost fixes for congestion and safety. The Route 3 corridor study covers North Main Street from Hawthorne Avenue to School Street. The Route 200 study covers Irvington Road southwest of town, from Old Saint Johns Road and White Pine Drive to Harris Road. VDOT lists $204,932 as the Route 3 study's estimated cost, a figure for the study and not for construction.

VDOT put draft concepts in front of the public at Lancaster Elementary School on Tuesday, Dec. 2, 2025, and took comments through Dec. 16, according to its announcement for the Lancaster County studies. The department said the concepts grew out of a survey it ran in spring 2025. VDOT also said at the time that the studies produce concepts for future funding applications and do not set construction schedules. The next step was for local governments to choose projects and apply for money. The three applications on the October list are that next step.

North Main Street, From the Walmart Signal to School Street

The Route 3 study handout names four signalized intersections on this corridor: Old Fairgrounds Way at the Walmart entrance, James B. Jones Memorial Highway at Route 688, the Food Lion and Rappahannock Community College entrances, and School Street. Lancaster's two Route 3 applications divide the corridor at Route 688. Number 13925 covers the north end and number 13926 covers the south end.

At the north end, the Route 3 display boards showed two approaches for Hawthorne Avenue and Old Fairgrounds Way. The first limits Hawthorne to right-in, right-out turns, with a median and a two-way left-turn lane on Main Street. The second adds a fourth leg to the existing signal, opposite Old Fairgrounds Way, also with a median and a two-way left-turn lane. Under the first, drivers leaving Hawthorne could no longer turn left onto Main Street. The second keeps that turn and puts it under the signal.

The south end has the most going on. At the Food Lion and college entrances, the boards showed changes to which driveways stay open and how they connect to Main Street. They also showed left-turn lanes, shared through and right-turn lanes, and a center two-way left-turn lane. An alternate version used a median. Both versions added crosswalks, curb ramps, pedestrian signals and sidewalk. At School Street, the concept was a right-turn lane on Route 3, a crosswalk across School Street with curb ramps and pedestrian signals, and an upgraded traffic signal.

The pedestrian work sits at the south end. That is where the corridor meets the college entrance and School Street, and where the boards drew crosswalks and sidewalk instead of only lane changes.

Irvington Road at Harris Road

On Route 200, the Route 200 display boards covered two intersections. At Old Saint Johns Road and White Pine Drive, VDOT showed a single-lane roundabout or a traffic signal with no lane changes. At Harris Road, it showed three options: new signal timing with no lane changes, a single-lane roundabout, or widening Harris Road to add separate left-turn lanes. Lancaster's Route 200 application is named for Harris Road.

This corner has drawn more attention since the study began. Willaby's left its riverfront building at the foot of the Norris Bridge after a last call in December 2025, and the Southside Sentinel reported in July that its new address is 86 Harris Road in Kilmarnock. We covered the history of that bridge-foot corner in our post on the building Willaby's left behind.

Why the County Filed for the Town

Most of North Main Street lies inside town limits, yet Lancaster County's name is on all three applications. On Thursday, Feb. 26, 2026, county supervisors reviewed the improvement options they would submit for SMART SCALE funding. They also reviewed the Kilmarnock Town Council's preferred solutions for the intersections inside town, the Rappahannock Record reported.

Olivia Hall, the county's director of planning and land use, explained the arrangement to supervisors, according to the Record. "In cases where the town lies within the county jurisdiction, the county must make the request for VDOT to pursue the preferred alternatives on behalf of the town. As such, the Town of Kilmarnock has reviewed the intersections included in the study that are within the town limits," Hall said.

So the town and the county each had a role in choosing among the options on the December boards. The Town Council reviewed the intersections inside town limits. The county reviewed the full set and filed the requests.

What Happens Between Now and January

SMART SCALE runs on a two-year cycle, and this round funds fiscal year 2028. In the October 2026 SMART SCALE update to the Commonwealth Transportation Board, state staff counted 289 full applications statewide, requesting about $6.3 billion as of Oct. 1, 2026. The Fredericksburg District, which includes Lancaster County, had 35 of those applications, requesting about $500 million toward roughly $680 million in total project costs. The district's other applications include several from the Fredericksburg-area planning organizations and Route 360 intersections in neighboring Essex County.

Requests in this round averaged $21.8 million each, compared with $27 million in the previous round, according to the same presentation's statewide figures as of Oct. 1, 2026.

The timeline from here is set. State staff are checking cost estimates and finishing scores through January. At the January board meeting, staff present each project's scorecard along with recommended funding scenarios. One scenario draws on the District Grant Program first and the other on the High-Priority Projects Program first. Lancaster County's three applications will appear in that release by number: 13921, 13925 and 13926. If you want to follow the Walmart signal, the Food Lion and college entrances, School Street or Harris Road, that January scorecard is the next document to read.

Until then, the December 2025 boards are the clearest public picture of the ideas for each intersection, and our Kilmarnock neighborhood page has more on the town these roads connect.

If you own a home or land near North Main Street or Route 200 and want to talk through what these plans could mean for your property, Beth Groner brings more than 30 years of homebuilding experience to questions like which driveways stay open and where a crosswalk lands. Schedule a personalized market consultation with Beth.

Work With Beth

With a deep knowledge of Northern Virginia and waterfront properties, I provide expert advice, strategic marketing, and a seamless buying or selling experience. Let’s work together to find your perfect home!

Follow Me on Instagram